Each person, please cut out the form below and submit information on
each team member, INCLUDING yourself. Assume everyone starts with
a 4, and adjust up or down from there. Please submit on paper in
a sealed envelope. I will keep these confidential, but will use
my best judgement
in evaluating them for your score.
1. Your
name:_______________________________________________________________________
2. The number of your group:______________
3. The name of each team member (including yourself) and a number
according to the following table:
| Team Member Name (Include yourself) |
Score |
Space for an Optional Comment |
| * |
||
| * |
||
| * |
||
| * |
||
| * |
||
| * |
| 6 | Excellent | Leaps tall buildings in a single bound | Consistently went above and beyond. Helped teammates, carried more than a fair share of the load. Obviously if you award this number to more than one person, we have a problem. This is not Lake Wobegon where all the children are above average. |
| 5 | Very Good | Leaps tall buildings in a bound and a half. | Consistently did what was required and often went above. Was well-prepared and made good contributions to the team. |
| 4 | Good | Leaps mid-height buildings in two bounds or less | Usually well-prepared. Often made useful contributions. |
| 3 | Acceptable | Walks around buildings without walking into their walls | Usually did work that others suggested, but did not have a major contribution to the project. |
| 2 | Marginal | Walks into walls but doesn't hurt self or others. | Attended meetings, but conributed little, but nevertheless was not disruptive. |
| 1 | Unsatisfactory | Talks about leaping buildings, but doesn't do it. | Overall, had an adverse effect on the group's performance, by delaying, or promising but not delivering. |
| 0 | No Show | Who? | Never showed up or did any work toward the project. |